Most of the waiting on a Georgetown replacement happens before tear-off. The committee has to see the shingle, and the city has its own review clock. We plan the job around both, so the date you are given is a date that holds.
Send the form and we will call back to book a visit, or ring (214) 766-3669 from 7 am to 6 pm, any day of the week.
Three documents shape a Georgetown replacement long before the crew trailer arrives, and our estimate is written to answer all three.
If your subdivision’s deed restrictions give an architectural committee a say, the estimate names a shingle, color and profile from its approved list, and we help you assemble the request it reviews.
The City of Georgetown lists Roof/Re-Roof among its residential permit types. We confirm with you how the permit is handled for your address and build its review time into the schedule.
When hail or wind started this, we explain how replacement cost and actual cash value coverage treat a roof of your roof’s age. The crews and standards are the ones behind our residential reroofs from North Texas to the Austin area.
Call or send the form. If your neighborhood has architectural guidelines or a list of approved roofing products, have them handy, along with any storm date behind the job.
We come to your Georgetown address, photograph each slope and write an estimate that names a product your committee can approve.
With the committee’s answer and the city’s permit in hand, your project manager orders material, books the crew and stays your contact through the final walk.
Nearly half of Georgetown’s homes were built in 2010 or later, so many roofs being replaced here are not old at all, only storm-worn; that housing story and our Central Texas team sit with our Georgetown roofing company and its HOA-matched approach.
Not every Georgetown roof with wind-lifted shingles needs to come off. When the damage is confined, repairs for shingles loosened by Georgetown’s gusts are the smaller job, and we price that option next to the replacement whenever it is realistic.
When a storm is what made the roof a replacement, the dated hail and wind record for the city, and how we photograph damage for an adjuster, belongs to storm damage repair for Georgetown wind and hail.
Feedback
From residential and commercial roof replacement to urgent emergency roof repairs, our 5-star service speaks for itself.
Get a free assessment and a written scope before anything is ordered. You will see the photos, the products your committee is likely to accept and a realistic start window.
The City of Georgetown’s residential permits list names Roof/Re-Roof as its own permit type (City of Georgetown, Residential Permits). The same list states that a building permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, and that the city builds to the 2021 International Residential Code and the 2021 International Energy Conservation Code.
Three details on that list shape a reroof schedule. Residential plan review runs 15 to 20 business days from the time an application is accepted, which is three to four working weeks. Inspections happen Monday through Friday, 8 am to 3:30 pm, and must be requested online through My Government Online before 3 pm, with no phone requests and no promise of next-day service. And the permit rules can reach past the city limit: where an address sits in the ETJ or the county but the City of Georgetown provides its water, wastewater or electric service, building permits apply.
The list also includes a Certificate of Appropriateness for the Downtown and Old Town overlays. If your home sits in either, tell us at the assessment, so the question of whether your roof work needs one gets settled before a date is set.
Order matters when two reviewers are involved. An association that has not yet approved the shingle can send the request back, and every week spent on a second request is a week the roof waits. So we get the committee’s answer on the exact shingle first, or file both together when the product is plainly on the approved list.
Texas law limits what the committee can refuse. Section 202.011 of the Property Code bars an association from banning shingles designed mainly to resist wind and hail, as long as they resemble shingles already allowed in the subdivision, are of equal or better quality and more durable, and match the look of the surrounding homes. Color and style still go through review, which is why we start inside the approved palette.
The most common slip is ordering before approval. Material bought for a color the committee then turns down sits in a garage, and the roof waits for a second order.
The second is counting calendar days. A plan review quoted in business days runs longer than it sounds once weekends and holidays fall inside it, and inspections are only booked on weekdays. A replacement planned for a particular week, ahead of a sale or a family event, needs that margin built in.
The third shows up mid-job. Soft or water-stained decking only appears once the old roofing is stripped, and boards that have to be replaced add time and material to the day. We photograph each one before it is replaced, so you see why the scope grew.
Georgetown’s hail record makes product choice worth some thought, and the committee’s palette narrows it. Three choices come up at most assessments.
Not every shingle sold as impact resistant performs the same. The Insurance Institute for Business and Home Safety buys shingles at retail and rates them on dents, tears and granule loss after realistic hail impacts (IBHS hail ratings for impact-resistant shingles). We check which approved colors come in the better-rated lines.
Designer shingles give a heavier, dimensional look that some associations favor on street-facing roofs. They usually mean a narrower set of colors, so we confirm the committee’s list carries the one you want.
Tile suits Spanish and Mediterranean elevations, and standing seam metal fits modern designs or a porch accent. Both change the profile of the house, so expect closer review by the committee, and we allow extra time in the schedule.
The crew strips every layer: shingles or tiles, the old felt or underlayment, and the flashing at chimneys, valleys and vent pipes. Boards that are water-damaged, moldy, unsound or spaced wrong for current standards are replaced before anything new goes on.
The Asphalt Roofing Manufacturers Association describes drip edge as a way to keep water from getting under the shingle edge and rotting the deck and fascia (ARMA, drip edge at eaves and rakes). It calls for a corrosion-resistant metal reaching at least 2 inches onto the sheathing and at least 1/4 inch below it, with an outward bent flange, laid under the underlayment at the eaves and over it at the rakes, and nailed every 8 to 10 inches. ARMA strongly recommends it on every shingled roof and notes that local codes may require it.
Ice and water shield goes into the valleys and other weak spots, and new pipe jacks, chimney flashing and vent collars go around each penetration. Synthetic underlayment covers the deck, starter shingles reinforce the edges against wind uplift, and the main courses go on in staggered rows to the manufacturer’s specifications.
Ridge caps and vents close the top, with ventilation installed or upgraded at the same stage. Where the permit calls for an inspection, it is requested online and carried out on a weekday, so the final walk is set around that visit.
Your project manager runs install day in a set order, so the house and the street are left as they were found.
Before any roofing comes off, tarps go over flower beds and the ground along the house to catch debris.
Old material is cleared as each slope is stripped. Once the new roof is on, the crew blows off the roof and gutters, runs magnets across the lawn and drive for nails and hauls everything away.
Your project manager walks the property with you, checks the finished roof and goes over the photos of the old roof, any replaced decking and the new work.
The sooner the committee sees the right shingle, the sooner the city review can start. A free assessment gives you the photos, a product that fits your association’s list and a written scope.
Call (214) 766-3669 from 7 am to 6 pm, seven days a week, or send the form and we will call you back. Scheduling runs from our office at 12800 Westridge Blvd, Suite 162, in Frisco, and our Central Texas team handles Georgetown roofs.
Reliability. Relationships. Results.
Book a free assessment and get the replacement scope in writing.
Georgetown roof replacement questions
The City of Georgetown says residential plan review takes 15 to 20 business days from the time an application is accepted, and Roof/Re-Roof is on its list of residential permit types. Add the time your HOA committee needs, if you have one, and the weekday-only inspection schedule, and plan the start date with that margin.
It can. The city states that if an address is in the ETJ or the county and the City of Georgetown is its water, wastewater or electric provider, building permits apply. Check your utility bill to see who provides those services, and tell us at the assessment so the scope reflects it.
They help you choose within the limit. IBHS rates impact-resistant asphalt shingles on dents, tears and granule loss, and it notes that not all impact-resistant shingles perform the same. Under Property Code Section 202.011 an association cannot ban wind and hail resistant shingles that match the look of the neighborhood, so we look for a well-rated line in an approved color.
A storm claim will pay less on an older or worn roof, because actual cash value coverage deducts for age and condition. TDI notes that some insurers make this switch at renewal as roofs age and should tell you when they change coverage. Check your declarations page before the next storm season, since it affects how much of a replacement a claim would cover.
The city lists a Certificate of Appropriateness for the Downtown and Old Town overlays among its residential permits. Whether your roof work needs one depends on the overlay’s rules and the material you choose, so ask the city’s historic preservation staff early, and tell us at the assessment so the schedule allows for it.